Leapmotor's B10 Rolls Off in Zaragoza — and the Parts Question Follows
Leapmotor’s B10 rolled off the line at Stellantis’s Zaragoza plant this month.

The battery plant is operated by Leapmotor’s own team. It supplies modules for the B10 and, eventually, the B05, A10, and A05. First-phase localisation content exceeds 40%. The CKD model covers stamping, welding, and painting on site. The plant went from an empty building to PPAP approval in seven months.
That’s the spare parts arrival rate at Leapmotor’s European central warehouse, according to Stellantis China and Asia-Pacific chief Xin Tianshu. Most repairs are completed within two days. The network exceeds 1,000 sales and service points across 36 European countries in under two years.
Leapmotor’s Spanish setup solves the supply-side problem. Modules are assembled in Europe. The parts pipeline is shorter. The logistics chain is inside the EU.
Leapmotor has done what few Chinese brands have done: put battery assembly and vehicle assembly in the same region, with a parts pipeline that reports 98% arrival rates. The infrastructure is there.
But the Mall?n plant supplies the car plant. The warehouse supplies the dealer network. If a Leapmotor B10 arrives at an independent workshop in 2028 with a battery module fault, does a repair path exist outside the authorised channel”
Related: China-made parts index
Sources: company statements and trade press as cited in the text.
Originally published on LinkedIn — read the post and the discussion →