Great Wall Motor to Build ORA Production in Bulgaria

Great Wall Motor to Build ORA Production in Bulgaria

Great Wall Motor will start building the Ora 5 compact SUV in Bahovitsa, near Lovech in Bulgaria, in the first quarter of 2027. Planned capacity: 50,000 vehicles a year. Its first manufacturing base in Europe.

Great Wall Motor to Build ORA Production in Bulgaria
Great Wall Motor to Build ORA Production in Bulgaria — illustration by GNSGO / Deep Drive China.

GWM’s China-built EVs face a 20.7% EU countervailing duty on top of the standard 10% import tariff. Local assembly changes the tariff line. GWM targets 60,000 European sales in 2027 and a 3% to 5% market share by 2030.

GWM CTO Nicole Wu said the plant will start with SKD assembly, though “supply of some parts will be localised from the very beginning”.

GWM’s 2025 European sales were around 3,500 units, down nearly 30% year-on-year. Reaching 60,000 in 2027 requires more than a factory. It requires a dealer network, a brand, and — the part that comes last — a parts pipeline.

GWM is building 50,000 units of annual capacity in Bulgaria, targeting 60,000 European sales next year. That is a 16-fold increase from 2025. The factory will be local. The vehicles will be local. The parts channel will remain whatever GWM decides it should be.

If a Bulgarian-assembled Ora 5 arrives at an independent workshop in 2028, will the parts ordering path and the diagnostic access follow the assembly line — or the Chinese engineering chain”

Related: China-made parts index

Sources: company statements and trade press as cited in the text.

Originally published on LinkedIn — read the post and the discussion →

Servicing these cars in Europe

Related articles